CUB Building for the Barcelona Science Park (UB)
Barcelona has established itself as a European benchmark in biomedicine thanks to its network of hospitals, research centers, and universities. Infrastructures such as the Barcelona Science Park (University of Barcelona) are key to driving innovation, offering laboratories and advanced technology to public and private institutions in the health sector.
The CUB building, located in the Barcelona Science Park (PCB), is a large auditorium for scientific conventions that was never completed when the 2008 crisis broke out, leaving only the empty shell inside. The project consists of transforming this building into a non-experimental research center by introducing three new floor slabs into its interior.
The intervention responds to a double need: to meet the growing demand for non-experimental research spaces and, at the same time, to revalue the building’s architecture and its relationship with the immediate surroundings of the Science Park. The project not only increases the building’s floor area but also substantially improves the quality of its interior and exterior spaces.
One of the fundamental axes of the proposal is the creation of a large central atrium that vertically connects the four new floors of the building. This architectural void, linked to the new main entrance, allows for a clearer distribution, favors the entry of natural light, and acts as a space for interaction and circulation, fostering collaboration between users. This decision to create a void also allows the total area to be adjusted to a single fire sector, simplifying the building’s operation and reducing costs.
Regarding functionality, the project focuses on a modular and flexible organization of research spaces, optimized to accommodate up to 25 laboratories. Each floor maintains a repetitive and clear distribution, with meeting areas, phone booths, coffee points, and outdoor terraces that act as thermal buffers. This structure allows for different usage configurations: from a coworking-type setup to occupation by a single company or one entity per floor.
Sustainability and energy efficiency are key pillars of the proposal. The building is designed as an NZEB (nearly zero-energy building), with a fully insulated envelope, passive climate control systems, natural light harvesting, and a bioclimatic strategy centered on the atrium, which functions as a greenhouse in winter and as a chimney that provides natural ventilation in summer.
The roof integrates photovoltaic panels that generate up to 750 kWh annually, reducing CO₂ emissions by more than 26 tons per year.
The materials used prioritize low environmental impact. The new structure is executed with CLT (cross-laminated timber) prefabricated panels, a material with very low CO2 emissions that reduces the structural load and allows for cleaner, faster, and more precise construction. Additionally, elements from the existing building itself are reused, such as metal trusses or the panels that make up the original facade.
Finally, interior well-being aspects such as air quality, acoustic comfort, and circadian lighting have been taken into account. Spaces such as mindfulness rooms, outdoor areas for resting or working, and the presence of interior vegetation reinforce the healthy and pleasant experience of the building.
Project:
Non-experimental research center of the Barcelona Science Park CUB Building. (UB).
Type:
Research Center. University
MEP Engineering:
AIA Instal.lacions
Structural Engineering:
Eskubi-Turró
Sustainability:
DEKRA
Technical architecture:
Francesc Belart
Renders:
Memorable Creative Studio
Location:
C/ Baldiri Reixac, 4, Barcelona
Area:
2,812.1 m2
Client:
Barcelona Science Park (University of Barcelona)
Status:
Public competition. 1st Prize
The non-experimental research spaces are oriented toward the southwest facade to capture natural light through the openings made in the facade.
The terraces facing Dr. G. Marañón Ave. function on each floor as a thermal buffer between the interior and exterior, creating a quality space suitable for resting or working.
The project incorporates a large terrace that creates an outdoor space within the workspace. This space is pleasant and protected in both winter and summer, allowing the use of the covered outdoor space as a natural extension of the offices themselves.